Andersen A3 Installation in Pembury
Request a quotation for an Andersen A3 at your Pembury property. Your enquiry can be matched with an independent installer who will assess the electrical supply, cable route, charger position and selected exterior finish.
- 7kW hidden tethered charging cable
- Thirteen standard colour finishes
- App, solar and smart-tariff features
Request a Free Quote
Select your installation type and enter your details below.
A charger designed to complement the property
Is the Andersen A3 Right for Your Pembury Home?
The Andersen A3 is intended for drivers who want the convenience of a tethered charger without leaving the charging lead permanently on show. Its 5.5-metre Type 2 cable stores inside the enclosure, while exterior colour choices allow the unit to be coordinated with brickwork, render, doors or architectural details.
Why Homeowners Consider the A3
The hidden-cable system keeps the lead at the wall but puts it away neatly after use. This can be valuable when the charger sits beside a front entrance or on an elevation where a conventional coiled cable would be visually prominent.
- 7kW single-phase home charging
- Integrated 5.5m tethered Type 2 cable
- Thirteen metal colours included as standard
- App control, solar compatibility and charger locking
- Convenience lighting near the unit
When the A3 May Not Be the Best Fit
Its design-led construction attracts a higher typical installed price than many compact plastic units. The present A3 is also a 7kW model with a fixed 5.5-metre cable, so it may not suit three-phase charging or parking spaces that need a longer lead.
- Consider Andersen A2 if 8.5m is required
- Consider Quartz for a socketed configuration
- Confirm 5.5m reaches every normal parking position
- Allow wall space for the larger enclosure
- Compare finish upgrades as well as base hardware

Andersen A3 selected on this page
Compare Popular EV Chargers in Pembury
Andersen A3 is highlighted and unlinked because this is its dedicated guide. Select another charger heading to open that model’s Pembury installation page.
| Feature | Zappi | Hypervolt | Ohme Pro | ePod | Andersen A3 | Tesla | Easee | Wallbox | EO Mini | Pod Point |
|---|---|---|---|---|---|---|---|---|---|---|
| Smart App Control | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Solar Compatible | ★★★★★ | ★★★★☆ | ★★★☆☆ | ★★★☆☆ | ★★★★☆ | ★★☆☆☆ | ★★★☆☆ | ★★★★☆ | ★★★☆☆ | ★★☆☆☆ |
| Tethered Available | ✓ | ✓ | ✓ | × | ✓ | ✓ | × | ✓ | ✓ | ✓ |
| Untethered Available | ✓ | × | × | ✓ | × | × | ✓ | ✓ | ✓ | × |
| Smart Connectivity | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Load Balancing | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Voice Assistant Support | × | ✓ | × | × | × | × | × | ✓ | × | × |
| Best For | Solar homes | Smart homes | Tariff users | Budget option | Premium homes | Tesla owners | Compact design | Smart homes | Small spaces | Simplicity |
| Typical Installed Cost | £1,250–£1,500 | £1,100–£1,350 | £1,050–£1,250 | £1,000–£1,200 | £1,400–£1,800 | £1,000–£1,250 | £1,000–£1,250 | £1,050–£1,300 | £1,000–£1,250 | £1,050–£1,250 |
The current A3 uses a hidden 5.5m tethered cable; it is not the socketed Andersen model. This table is an indicative guide, so verify current specifications, app functions, compatibility and the installer’s written price.
Store the lead inside the enclosure
Hidden Tethered Cable Without a Loose Wall Coil
A conventional tethered charger leaves the vehicle lead wrapped around the body or a separate holster. The A3 takes a different approach: its attached cable returns into the enclosure, helping the wall look composed once charging is finished.
For everyday use, the driver pulls out the length required, connects the Type 2 plug and stores it again afterwards. The charger position still needs careful thought because the cable has a fixed maximum reach. A route that works for today’s car should also allow for reasonable changes in vehicle size or inlet position.
Current A3 size and configuration
Andersen A3 Specifications
The present A3 is intended for 7kW single-phase home charging and includes a 5.5-metre hidden tethered cable. Its enclosure is approximately 430mm high, 310mm wide and 148mm deep, so it requires more wall area than compact chargers whose leads remain visible outside.
App features include charging management, remote locking and supported solar and smart-tariff functions. A seven-year warranty is advertised for Andersen charge points, subject to activation and the manufacturer’s current terms. The installer should explain which elements of product support and workmanship are covered separately.
Details are based on current published Andersen A3 information. Confirm the exact product revision, electrical protection, connectivity, exterior specification, warranty conditions and installation hardware in writing.
| Rated power | 7kW single phase |
|---|---|
| Vehicle connector | Tethered Type 2 |
| Cable length | 5.5m |
| Cable storage | Hidden inside enclosure |
| Dimensions | 430 × 310 × 148mm |
| Standard design choices | 13 metal colours |
| Smart control | Andersen mobile app |
| Renewable charging | Solar compatible |
| Lighting | Convenience ground lighting |
| Product warranty | 7 years, subject to terms |
Choose the exterior before the order is placed
Matching the Charger to a Pembury Property
The A3 is often selected because the charge point forms part of the property’s appearance rather than being treated as purely electrical equipment. Finish choice should therefore be considered at the same time as position, cable reach and supply route.
Metal Colour Options
Thirteen metal colours are currently offered as standard. Compare physical samples or reliable product imagery against the wall in daylight rather than relying only on a phone display.
Premium Fascias
Wooden and special-edition finishes may also be available. Confirm the exact material, weathering expectations, additional price and lead time before approving the quotation.
Visible Cable Route
A carefully selected casing can still be undermined by poorly planned supply wiring. Discuss rear or discreet cable entry, isolation equipment and any unavoidable trunking with the installer.
Indicative A3 installation pricing
Andersen A3 Installation Cost in Pembury
A realistic guide for an installed Andersen A3 is approximately £1,400–£1,800. The lower end may cover a straightforward installation with a standard finish, while premium fascia choices, long electrical routes or upgrade work can take the total higher.
Typical Planning Range
£1,400–£1,800Ask for the chosen colour, fascia, A3 hardware, normal installation work, commissioning and electrical certification to be itemised.
What Can Increase the Quote?
Long supply cabling, groundworks, consumer-unit alterations, remedial work, concealed routes, difficult access and non-standard finishes may all add cost.
Possible Grant Support
Eligibility depends on property and applicant circumstances. Renters, flat owners, landlords and workplaces can review our EV charger grants guide before requesting an assessment.
Approximate charging at the rated 7kW
How Long Does the Andersen A3 Take to Charge?
The examples divide usable battery capacity by 7kW and round the result. A normal session starts with energy already remaining in the battery, so an overnight top-up will often be considerably shorter than these theoretical empty-to-full figures.
| Usable battery capacity | Approximate 0–100% time | Possible energy in four hours |
|---|---|---|
| 40kWh | About 5 hours 45 minutes | Up to 28kWh |
| 60kWh | About 8 hours 35 minutes | Up to 28kWh |
| 80kWh | About 11 hours 25 minutes | Up to 28kWh |
| 100kWh | About 14 hours 20 minutes | Up to 28kWh |
Charging losses, battery temperature, the vehicle’s AC limit, household demand management and smart schedules can extend the time. The A3 is a 7kW model rather than a 22kW three-phase charger.
Smart energy settings beyond the enclosure design
App Control, Solar Charging and Tariff Integration
The A3 is not only a design product. The Andersen app supports remote charger locking and management of charging behaviour. Supported solar functionality can help a suitable installation respond to self-generated energy, while compatible tariff integrations can influence when grid charging takes place.
These functions depend on the charger configuration, household metering, current software and the energy arrangement selected. Tariff partnerships and enrolment requirements can change. If a specific electricity product or solar mode is essential, obtain confirmation that the proposed A3 and app support it before the order becomes binding.
Cable reach, wall area and electrical route
Planning an A3 Installation in Pembury
Measure from the intended charger position to the car’s inlet with the vehicle parked normally in both directions. The 5.5-metre lead needs to reach without being stretched, driven over or pulled across a regular walking route. The enclosure also needs suitable clearance for cable deployment and storage.
The electrical assessment should cover the incoming fuse, consumer unit, earthing, maximum household demand and cable route. Solar PV, battery storage, electric heating and other large loads should be disclosed because they affect the design and load-management strategy.
Pembury contains period homes, modern developments and properties with longer private drives. Locations around Church Road, Hastings Road, Old Church Road and Cop Hall Lane can present very different wall materials and supply routes, so a quotation should be based on the actual site rather than a generic allowance alone.
From design preference to individual quote
Arrange an Andersen A3 Installation Assessment
Submitting an enquiry is free and does not commit you to proceed. The independent company should assess the property and issue its own written installation proposal and contractual terms.
Send Your Details
Select residential or commercial and provide the Pembury postcode.
Choose the Appearance
Identify preferred colours and explain where the charger will be visible.
Check Cable Reach
The installer reviews parking, wall space, supply route and electrical demand.
Review the Proposal
Confirm the exact finish, included work, warranty responsibilities and total price.
Andersen A3 questions for Pembury homes
Frequently Asked Questions
Does the Andersen A3 have a hidden charging cable?
Yes. The Type 2 charging lead is tethered to the unit and stores inside the A3 enclosure when it is not in use. This provides fixed-cable convenience without leaving a large coil permanently visible on the wall.
Is the Andersen A3 available as an untethered charger?
The current A3 is supplied with a hidden 5.5-metre tethered cable. If a socketed Andersen charger is required, compare the current Quartz configurations and confirm the selected specification with the installer.
Can I order an A3 with a longer cable?
The current A3 specification uses a 5.5-metre cable. Andersen A2 is the model to consider when an 8.5-metre hidden cable is needed. Measure the actual parking arrangement before choosing either charger.
Does the Andersen A3 provide 22kW charging?
No. The A3 is designed for 7kW single-phase charging. If three-phase 22kW AC charging is required, the property supply, vehicle capability and an alternative Andersen model must be assessed.
Which colours and finishes are available?
Andersen currently lists thirteen metal colours as standard for the A3, with premium wooden and special-edition finishes also promoted. Availability, extra cost and lead time should be confirmed for the exact order.
Can the Andersen A3 work with solar panels?
Yes, the 7kW A3 is promoted as solar compatible. The performance depends on the PV system, metering, household demand and charger configuration. Provide the installer with inverter and battery details during the assessment.
What smart controls does the Andersen app provide?
The app supports charger management, remote locking and supported smart-energy functions. Exact screens, tariffs and integrations can change with software updates, so verify any essential feature before purchasing.
How much is Andersen A3 installation in Pembury?
A typical planning range is approximately £1,400–£1,800. The selected finish, electrical route, consumer-unit condition, groundworks, access and any remedial work can affect the final written quotation.
Who carries out the installation?
EVChargersTunbridgeWells.co.uk is an independent lead-generation service and does not install chargers. The independent company receiving the enquiry is responsible for its assessment, quotation, contract, workmanship, certification, warranties and aftercare.
Residential and commercial enquiries
Request an Andersen A3 Quote in Pembury
Tell us about the property, parking position and finish you prefer. Your enquiry can be introduced to an independent EV charger installation company covering Pembury.
Return to the Quote FormCall 07780 900260